Joosep Pata

Results 115 comments of Joosep Pata

kind ping BTV folks @emilbols, @demuller, @andrzejnovak, @AlexDeMoor @cms-sw/btv-pog-l2

+reconstruction - on the reco side, it's transparent / minimal (no observed changes) - the reco part is a direct backport of https://github.com/cms-sw/cmssw/pull/38398

+reconstruction - resign with no reco-related changes - on the reco side, it's transparent / minimal (no observed changes) - the reco part is a direct backport of https://github.com/cms-sw/cmssw/pull/38398

+reconstruction - on the reco side, there is no impact (I understand it's for emulator studies)

+reconstruction - small changes in HI electrons due to changes in the seed threshold (also apparent above 5 GeV due to fakes)

Vacations affect our review turnaround time during summer, but I think it's on track for the next release. - Which workflows does the new code run in? - Are any...

> No workflow currently contain this added reconstruction scheme, as the detector is not yet integrated into cDAQ and we can only rely on simulated frames. It might be useful...