Mirko Barthauer

Results 158 comments of Mirko Barthauer

Happens on edge B2B1 where vehicles 329 and 341 block each other... (t=900)

How to integrate a little more long-term view than searching for a last-resort charging opportunity? If (working) days and **trip chains** are simulated, more conditions and constraints would become important:...

Is the current unit for `E_est` W/s in the flow chart right? W is already defined as J/s. I think this should be just W...

Feature request: Deactivate the device temporarily (e.g. by TraCI) to end an important trip such as a taxi ride of a passenger.

Additional feature: inspect planned stops (from other sources, e.g. predefined in XML) for charging stations and eventually let the vehicle proceed if it is estimated to make it there.

Added a parameter **device.stationfinder.maxEuclideanDistance** to limit the search for charging stations spatially. This is needed for large networks / networks with a lot of charging stations because ranking them all...

Some more ideas: - optionally set a target SoC / a maximum charging duration - optionally set a threshold when the charging stop shall replace a planned stop close by...

There is a reason this attribute is not documented. The "prefer" attribute seems to be implemented on the input side only but isn't used inside the simulation. Unfortunately I don't...

@henrigrossmann Your screenshot suggests the bike lane continues along the whole length between two intersections. If the bike lane was only in an intersection approach (~50-100m upstream), then a practical...