Alan Sangma

Results 7 issues of Alan Sangma

### Actual Behavior In Firefox and Safari, when a Dropdown is added to the `menu-actions` slot of PickList (and ValueList), the Dropdown's position doesn't respect the `sticky` position of the...

bug
p - high
0 - new
blocked
milestone adjusted
has workaround

### Description * Separate out textarea from CalciteInput. * Retain a slot for action(s) * Layout actions at the bottom in a sort of footer * Add support for resize...

enhancement
new component
1 - assigned
epic
milestone adjusted

### Actual Behavior When Button is `appearance="outline"` and `color="neutral"`, the border color is set to `foreground-3`. ### Expected Behavior Border color should be `border-1`. ### Reproduction Sample https://codepen.io/mtb-alan/pen/vYjgrJE ### Reproduction...

bug
0 - new
needs triage

### Check existing issues - [X] I have [checked for existing issues](https://github.com/Esri/calcite-design-system/issues) to avoid duplicates ### Description ListItem has `drag-disabled`. This is good, but there are cases when the drag...

enhancement
design
0 - new
p - medium
ArcGIS Maps SDK for JavaScript
needs milestone
ready for dev
calcite-components
estimate - design - md
p3 - want for upcoming milestone

### Check existing issues - [X] I have [checked for existing issues](https://github.com/Esri/calcite-design-system/issues) to avoid duplicates ### Description By deprecating layout on ActionGroup it removes the ability to use grid layout...

enhancement
design
0 - new
p - medium
ArcGIS Maps SDK for JavaScript
estimate - 3
impact - p2 - want for an upcoming milestone
needs milestone
ready for dev
p3 - want for upcoming milestone

### Description BlockSection heading is very similar to Block's heading. Suggest using normal font weight for BlockSection headings. Also, it seems that the padding in the content area of Block...

enhancement
design
1 - assigned
p - medium
estimate - 2
p4 - not time sensitive
ready for dev
estimate - design - sm

### Description Add a scale property to Panel. Popover has scale, and it is helpful. But there are times when a flow needs to happen in a Popover **and** in...

enhancement
design
p - high
1 - assigned
estimate - 5
impact - p3 - not time sensitive
ready for dev