Lena

Results 6 comments of Lena

This gets suggested every so often, from inside and outside the team, and there are definite advantages to it, but also some major downsides. We already have a _massive_ amount...

The version I use is a bit older than that, but it works fine (apart from a few minor bugs). If that version doesn't work, I can send you mine.

Ohai :) Working towards the Third Weltkrieg is something I've been wanting to do for a long time, it was one of the long-term projects I was hoping to get...

I've had a quick look at the code, and it appears the base build time of the last three models is 300 days (the first three take something like three...

Ah, I see what happened - it's the assembly line techs. Those are set to apply a 20% construction time reduction, but what it actually *does* is check the first...

Base construction time for CVEs from the Manila-class forward is 300 days, down from 1080 or so for the preceding model. The big difference is carried over from the initial...