Work Manager Challenge Status Sync issue
There have been cases reported where the challenge created via WM is marked completed in Direct/ OR but the status on WM still shows draft and on the challenge details page the status is in progress.
For example
The task is shown on the Draft tab in Draft status
https://challenges.topcoder.com/projects/25300/challenges/c7b62375-041a-4455-9c06-266dbb97f14a/view, while it has to be shown as Completed.
Also, in the Community App it is still shown as Draft without the winner chosen, which might mislead the member https://www.topcoder.com/challenges/c7b62375-041a-4455-9c06-266dbb97f14a.
On OR it shows completed. which is the actual status of the challenge
Another example where the status on WM is draft but the challenge is ACTIVE
Challenge : https://challenges.topcoder.com/projects/26595/challenges/d6114afe-e62c-4c13-a585-4e3af1f24d27/view
WM shows Draft
Challenge page Draft
OR : Active