Tamara Dahlgren
Tamara Dahlgren
> @tldahlgren Can this be merged even though gitlab-ci is failing? It looks like the failure is from e4s, and specifically Trilinos. The Trilinos versions being built in the pipeline...
> I don't think there are any further trilinos updates available; @jwillenbring could comment perhaps? It sounds as though that there needs to at least be some version restrictions for...
@liuyangzhuan Do you want to revisit this PR before it gets merged?
@spackbot fix style
Looks like `perl` is failing for a couple of stacks.
Looks like pipeline may have had some pod issues (at least one stack's `phist` build). Performing branch update to force re-running checks.
Still having pipeline issues with `perl` on Mac and `phist` (https://gitlab.spack.io/spack/spack/-/jobs/3328481).
@ChristianTackeGSI Do you have any issues with this PR getting merged?
@spackbot run pipeline
@alalazo None of the code was changed so patch coverage is 0%. Haven't looked but wondering if this is a special case we can/should handle. Not sure why the code...