tailcall
tailcall copied to clipboard
fix(deps): update rust crate tower to 0.5.0
This PR contains the following updates:
| Package | Type | Update | Change |
|---|---|---|---|
| tower | dependencies | minor | 0.4.13 -> 0.5.0 |
Release Notes
tower-rs/tower (tower)
v0.5.0: tower 0.5.0
Fixed
- util:
BoxServiceis nowSync(#702)
Changed
- util: Removed deprecated
ServiceExt::ready_andmethod andReadyAndfuture (#652) - retry: Breaking Change
retry::Policy::retrynow accepts&mut Reqand&mut Resinstead of the previous mutable versions. This increases the flexibility of the retry policy. To update, update your method signature to includemutfor both parameters. (#584) - retry: Breaking Change Change Policy to accept &mut self (#681)
- retry: Add generic backoff utilities (#685)
- retry: Add Budget trait. This allows end-users to implement their own budget and bucket implementations. (#703)
- reconnect: Breaking Change Remove unused generic parameter from
Reconnect::new(#755) - ready-cache: Allow iteration over ready services (#700)
- discover: Implement
Clonefor Change (#701) - util: Add a BoxCloneServiceLayer (#708)
- rng: use a simpler random 2-sampler (#716)
- filter: Derive
CloneforAsyncFilterLayer(#731) - general: Update IndexMap (#741)
- MSRV: Increase MSRV to 1.63.0 (#741)
Configuration
📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).
🚦 Automerge: Enabled.
♻ Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.
🔕 Ignore: Close this PR and you won't be reminded about this update again.
- [ ] If you want to rebase/retry this PR, check this box
This PR was generated by Mend Renovate. View the repository job log.
Action required: PR inactive for 5 days. Status update or closure in 10 days.
⚠️ Artifact update problem
Renovate failed to update an artifact related to this branch. You probably do not want to merge this PR as-is.
♻ Renovate will retry this branch, including artifacts, only when one of the following happens:
- any of the package files in this branch needs updating, or
- the branch becomes conflicted, or
- you click the rebase/retry checkbox if found above, or
- you rename this PR's title to start with "rebase!" to trigger it manually
The artifact failure details are included below:
File name: Cargo.lock
Command failed: cargo update --config net.git-fetch-with-cli=true --manifest-path tailcall-upstream-grpc/Cargo.toml --package [email protected] --precise 0.5.2
Updating crates.io index
error: failed to select a version for the requirement `tower = "^0.4"`
candidate versions found which didn't match: 0.5.2
location searched: crates.io index
required by package `lambda_runtime v0.13.0`
... which satisfies dependency `lambda_runtime = "^0.13.0"` (locked to 0.13.0) of package `tailcall-aws-lambda v0.1.0 (/tmp/renovate/repos/github/tailcallhq/tailcall/tailcall-aws-lambda)`
Action required: PR inactive for 5 days. Status update or closure in 10 days.
Action required: PR inactive for 5 days. Status update or closure in 10 days.
PR closed after 10 days of inactivity.
Renovate Ignore Notification
Because you closed this PR without merging, Renovate will ignore this update (0.5.0). You will get a PR once a newer version is released. To ignore this dependency forever, add it to the ignoreDeps array of your Renovate config.
If you accidentally closed this PR, or if you changed your mind: rename this PR to get a fresh replacement PR.