Results 97 comments of Potuz

The last two issues on the repo are about this. In addition the `ng` package is outdated with respect to the original `curve25519-dalek` package and so it's missing some methods...

I think the plan was to merge ~~3433~~ ASAP, it was agreed already on the merge and only timing is the issue. If any slot change is chosen for Glamsterdam,...

As we talked on Discord these proposed numbers may represent a considerable rework of Prysm design at least. The way we handle aggregation requires us currently to have by default...

I agree with Caspar, before clients shipped the late block reorg feature, seeing blocks at 11 seconds was common. However, I would support increasing the attestation deadline if it's shown...

> Would a rational attester also delay the attestation to capture extra rewards for timely voting? They only need to release the attestation early enough for aggregators to see it...

> [#16095](https://github.com/OffchainLabs/prysm/pull/16095) may fix this. [#16094](https://github.com/OffchainLabs/prysm/pull/16094) addresses the issue too. If the node is falling out of sync even with `--disable-last-epoch-targets` then #16095 shouldn't help much.

When you turn off your node, how do you do it? if it's being run by a systemd service can you post the `TimeoutStopSec` value?