Andrea Cosentino
Andrea Cosentino
It will be closed once we switch to catalog 0.9.0
We have some troubles with vertx and knative at the moment: https://github.com/apache/camel-k-runtime/pull/886
I think we should start a new release. The baseline is: - Camel-k-runtime 1.15.0 - Camel-Kamelets 0.9.1 on the runtime we are already aligned. Please list here what is missing...
I'll go ahead with the runtime for the moment and maybe with camel-kamelets so we should be ready.
Camel-K-runtime 1.15.0 Staged: https://repository.apache.org/content/repositories/orgapachecamel-1472/
Camel-Kamelets 0.9.1 staged: https://repository.apache.org/content/repositories/orgapachecamel-1478/
No rush. The runtime and kamelets was more or less prepared, for camel-k we can have a release next week.
Do we need something else to merge in 1.10.x or only #3674 ?
I think we are in good shape, when everything is in place I'll start the release process.
What is still missing for starting release process?