Odysseas Chatzopoulos
Odysseas Chatzopoulos
Thank you very much for the reply. That’s what I thought I just wanted to be sure. Do you have any suggestions on how to approach floor planning the SRAMs...
I am trying to place and route SmallBoom using the automatic floorplanning mode. Unfortunately the process halts after a while and I get the following message ``` CCOpt::Phase::Construction... Stage::Clustering... Clustering......
Can I check this if par has not finished normally ? If it were done I could open the design in innovus with the generated script but since it isn't...
Got it. I will use the script and will check for overlaps. The dimensions I picked for SmallBoomConfig where 4000x4000 (meaning 1000x1000 in actual dimensions due to the ASAP7 scaling)....
Ah ok thank you either way. Before you answered I was testing with the previous version of Innovus (20.11) and it just finished clock tree synthesis without error. It now...
I just opened the chip that was produced by version 21.11 (version which produces the assertion failed error) using the generated script. The floorplan view is the following 
This is a zip of the par-rundir if you want to open the chip in innovus yourself https://drive.google.com/file/d/14AylGeHKTM7OIS_ix8uzJkpG61lk2T2c/view?usp=sharing
Would increasing the chip size even more make the automatic floor planner leave more room ?