azurelinux
azurelinux copied to clipboard
Updated `grpc` to 1.62.0, `protobuf` to 25.3, and `abseil-cpp` to 20240116.0 to fix CVE-2023-44487.
Merge Checklist
All boxes should be checked before merging the PR (just tick any boxes which don't apply to this PR)
- [X] The toolchain has been rebuilt successfully (or no changes were made to it)
- [X] The toolchain/worker package manifests are up-to-date
- [X] Any updated packages successfully build (or no packages were changed)
- [X] Packages depending on static components modified in this PR (Golang,
*-staticsubpackages, etc.) have had theirReleasetag incremented. - [X] Package tests (%check section) have been verified with RUN_CHECK=y for existing SPEC files, or added to new SPEC files
- [X] All package sources are available
- [X] cgmanifest files are up-to-date and sorted (
./cgmanifest.json,./toolkit/scripts/toolchain/cgmanifest.json,.github/workflows/cgmanifest.json) - [X] LICENSE-MAP files are up-to-date (
./SPECS/LICENSES-AND-NOTICES/data/licenses.json,./SPECS/LICENSES-AND-NOTICES/LICENSES-MAP.md,./SPECS/LICENSES-AND-NOTICES/LICENSE-EXCEPTIONS.PHOTON) - [X] All source files have up-to-date hashes in the
*.signatures.jsonfiles - [X]
sudo make go-tidy-allandsudo make go-test-coveragepass - [X] Documentation has been updated to match any changes to the build system
- [X] Ready to merge
Summary
Updated grpc to version 1.62.0 to fix CVE-2023-44487. This also required updating protobuf and abseil-cpp. Unfortunately, our current version of grpc is too far behind for it to be possible to backport a patch.
Does this affect the toolchain?
No.
Associated issues
Links to CVEs
- https://nvd.nist.gov/vuln/detail/CVE-2023-44487
Test Methodology
- Local builds with tests.
- PR check.
- Full build.