PowerPlatformConnectors
PowerPlatformConnectors copied to clipboard
3E Events connector
When submitting a connector, please make sure that you follow the requirements below, otherwise your PR might be rejected. We want to make you have a well-built connector, a smooth certification experience, and your users are happy :)
If this is your first time submitting to GitHub and you need some help, please sign up for this session.
- [x] I attest that the connector doesn't exist on the Power Platform today. I've verified by checking the pull requests in GitHub and by searching for the connector on the platform or in the documentation.
- [x] I attest that the connector works and I verified by deploying and testing all the operations.
- [x] I attest that I have added detailed descriptions for all operations and parameters in the swagger file.
- [x] I attest that I have added response schemas to my actions, unless the response schema is dynamic.
- [x] I validated the swagger file,
apiDefinition.swagger.json, by runningpaconn validatecommand. - [x] If this is a certified connector, I confirm that
apiProperties.jsonhas a valid brand color and doesn't use an invalid brand color,#007ee5or#ffffff. If this is an independent publisher connector, I confirm that I am not submitting a connector icon.
Hello @isalzh,
Thank you very much and congratulations on your new submission. Please sign the CLA, we can't start the review process without it. You can see the link above this message. Once it's signed, our Certification Engineers will review the PR within 1-2 weeks.
Please let us know if you have any questions.
Thank you very much again for working with us.
Hello @isalzh,
I hope you are doing well.
I am following up with you to see how things are going with preparing your submission. We can't start the review without a signed CLA. You can find it above my messages.
Please let us know if you have any questions.
Thank you.
@isalzh You need to sign the CLA to get this PR merged into our repo.
Hello @isalzh,
I hope you are doing well.
Please sign the CLA, we can't merge the pull request without it. You can see it above all the messages or follow this link to see it.
Please let us know if you have any questions.
Thank you.
Hello @isalzh,
I hope you are doing well.
Congratulations, your pull request is approved and merged. Please submit the files to ISV Studio or update your submission using your latest commit ID, please allow us up to 1-2 weeks to review your submission, and our Engineers will notify you in the “Activity Control” area in ISV Studio. Please make sure that the icon meets all the requirements, that it’s size is 230x230, icon background is not white or transparent and it matches the iconBrandColor property in apiProperties.json file.
After making the submission in ISV Studio, please attach an intro.md file in the activity control section. This file is required and it's different from readme.md. You can find an example of intro.md file on this page at step 6.
Please Create an environment in the Preview region. You will use this environment later to test your connector after Microsoft is done with the functional verification for your connector.
We expect all tests to be completed within 1-2 weeks.
If your connector passes all tests, the deployment process begins, and it typically takes up to 3 to 4 weeks to deploy your connector to all of our regions.
Please let me know if you have any questions.
Thank you very much for working with us.