Martha Frysztacki
Martha Frysztacki
@p-glaum no... but the work-around is rather ugly, and would add +1 node to the lowest resolution making it 38 nodes. we should discuss if we really want that. edit:...
Had also a look into the `capital_costs` of the prepared network (not the EUR/m2, but the resulting costs after multiplying the costs per m2 with the floor area), and here's...
CI should be passing now :partying_face: problem: `s_nom=0` \forall TYNDP lines. if we assume `num_parallel=1` for all TYNDP lines, and `type=Al/St 240/40 4-bundle 380.0`, then the additional build TWkm capacity...
Quick update (probably mostly for my future self): I tried running the whole workflow now, but resulting in non-intuitive behaviour, e.g. network can now be clustered to 42 nodes (not...
But there is a high correlation between the temperature and the electrical load, isn't there? See for example  taken from https://doi.org/10.3390/en14113351. Seen many such plots over the years, stressing...
I agree, it's hard to build newer solar profiles for other years than 2013 using SARAH-2 data, but you can also use the era5 data for your solar profiles (instead...
Not sure if this links to #812
I suggest similar treatment as in PyPSA-Eur in OPSD_renewables function. We have an importer for RE gens from ppl.csv (which includes custom ppls), set their p_nom_min and p_nom (and updates...
i'm not sure this is compatible with your repository, but instead of copying lots of code from pypsa-eur, have you ever considered making pypsa-eur a subworkflow of pypsa-meets-africa and importing...
which day is your meeting?