manager icon indicating copy to clipboard operation
manager copied to clipboard

upcoming: [M3-9726] - New Detail Template Design v2 [DRAFT]

Open bill-akamai opened this issue 7 months ago โ€ข 1 comments

Description ๐Ÿ“

Highlight the Pull Request's context and intentions.

Changes ๐Ÿ”„

List any change(s) relevant to the reviewer.

  • ...
  • ...

Target release date ๐Ÿ—“๏ธ

Please specify a release date (and environment, if applicable) to guarantee timely review of this PR. If exact date is not known, please approximate and update it as needed.

Preview ๐Ÿ“ท

Include a screenshot or screen recording of the change.

:lock: Use the Mask Sensitive Data setting for security.

:bulb: Use <video src="" /> tag when including recordings in table.

Before After
๐Ÿ“ท ๐Ÿ“ท

How to test ๐Ÿงช

Prerequisites

(How to setup test environment)

  • ...
  • ...

Reproduction steps

(How to reproduce the issue, if applicable)

  • [ ] ...
  • [ ] ...

Verification steps

(How to verify changes)

  • [ ] ...
  • [ ] ...
Author Checklists

As an Author, to speed up the review process, I considered ๐Ÿค”

๐Ÿ‘€ Doing a self review โ” Our contribution guidelines ๐Ÿค Splitting feature into small PRs โž• Adding a changeset ๐Ÿงช Providing/improving test coverage ๐Ÿ” Removing all sensitive information from the code and PR description ๐Ÿšฉ Using a feature flag to protect the release ๐Ÿ‘ฃ Providing comprehensive reproduction steps ๐Ÿ“‘ Providing or updating our documentation ๐Ÿ•› Scheduling a pair reviewing session ๐Ÿ“ฑ Providing mobile support โ™ฟ Providing accessibility support


  • [ ] I have read and considered all applicable items listed above.

As an Author, before moving this PR from Draft to Open, I confirmed โœ…

  • [ ] All unit tests are passing
  • [ ] TypeScript compilation succeeded without errors
  • [ ] Code passes all linting rules

Commit message and pull request title format standards

Note: Remove this section before opening the pull request Make sure your PR title and commit message on squash and merge are as shown below

<commit type>: [JIRA-ticket-number] - <description>

Commit Types:

  • feat: New feature for the user (not a part of the code, or ci, ...).
  • fix: Bugfix for the user (not a fix to build something, ...).
  • change: Modifying an existing visual UI instance. Such as a component or a feature.
  • refactor: Restructuring existing code without changing its external behavior or visual UI. Typically to improve readability, maintainability, and performance.
  • test: New tests or changes to existing tests. Does not change the production code.
  • upcoming: A new feature that is in progress, not visible to users yet, and usually behind a feature flag.

Example: feat: [M3-1234] - Allow user to view their login history


bill-akamai avatar Jun 09 '25 17:06 bill-akamai

This PR is stale because it has been open 15 days with no activity. Please attend to this PR or it will be closed in 5 days

github-actions[bot] avatar Jun 25 '25 00:06 github-actions[bot]

Cloud Manager UI test results

:small_red_triangle: 2 failing tests on test run #12 โ†—๏ธŽ

:x: Failing:white_check_mark: Passing:arrow_right_hook: Skipped:clock1: Duration
2 Failing666 Passing6 Skipped118m 41s

Details

Failing Tests
SpecTest
:x:access-key.e2e.spec.tsCloud Manager Cypress Testsโ†’object storage access key end-to-end tests ยป object storage access key end-to-end tests
:x:object-storage.e2e.spec.tsCloud Manager Cypress Testsโ†’object storage end-to-end tests ยป object storage end-to-end tests

Troubleshooting

Use this command to re-run the failing tests:

pnpm cy:run -s "cypress/e2e/core/objectStorage/access-key.e2e.spec.ts,cypress/e2e/core/objectStorage/object-storage.e2e.spec.ts"

linode-gh-bot avatar Jul 01 '25 00:07 linode-gh-bot

This PR is stale because it has been open 15 days with no activity. Please attend to this PR or it will be closed in 5 days

github-actions[bot] avatar Jul 16 '25 00:07 github-actions[bot]

Closing while we await prioritization to continue this work.

bill-akamai avatar Jul 18 '25 20:07 bill-akamai