kvid
kvid
> [...] > Did I understand correctly that it's now possible to put different gauge wires in a bundle? I haven't seen an example of the syntax to do so,...
Thank you for sharing your work. I've not yet looked into the details, but I must answer your question "Does the wireviz rendering somehow rely on the direction of the...
- If you consider splitting your project into several harnesses, but still need an overall BOM, then I recommend to look at #267. - See #330 for several shielded wire...
This seems to be a duplicate of #282. Please consider the existing suggestions there, and continue that thread, unless you feel your use case is different and deserves a separate...
Thank you for describing your use case, and suggesting such a new feature. I think your use case is a bit similar to what is described in #142, and that...
Thank you for detecting and suggesting a fix for this bug. I tried your fix and I can verify that the HTML output looked correct, but I noticed that the...
The commit mentioned above is now cherry-picked into `master`, but the automatc checks seem not to be re-executed automatically. Maybe we need to rebase this PR branch on top of...
@TheMDev wrote: > I'm sorry for not getting back to you sooner. Nobody are contributing to this project as a payed full-time work and expected to answer quickly. > I...
Hi @Josh-B-1209, Unless you provide a bit more information (see [contributing guidelines](https://github.com/wireviz/WireViz/blob/master/docs/CONTRIBUTING.md)), I can only guess what has happened: - Maybe your YAML input contains a connector or cable with...
# Local Designators I suggest keeping: - The BOM item numbering strictly numeric, and auto-assigned after BOM de-duplication. - A global `additional_bom_items` and local `additional_components` for each connector/cable. However, I...