teal.modules.clinical
teal.modules.clinical copied to clipboard
[CRAN Release]: 0.9.2
Blocked by
PRs
- [ ] PR 1
Issues
- tern.gee 0.1.5
- [x] https://github.com/insightsengineering/formatters/issues/310
- [x] https://github.com/insightsengineering/rtables/issues/915
- [ ] https://github.com/insightsengineering/tern/issues/1281
Pre-release
- [ ] Make sure you adhere to CRAN submission policy:
- https://cran.r-project.org/web/packages/submission_checklist.html
- https://cran.r-project.org/web/packages/policies.html.
- [ ] Make sure that high priority bugs (label "priority" + "bug") have been resolved before going into the release.
- [ ] Review old/hanging PRs before going into the release (Optional).
- [ ] Revisit R-package's lifecycle badges (Optional).
- [ ] Make sure that all upstream dependencies of this package that need to be submitted to CRAN were accepted before going into release activities.
- [ ] Make sure integration tests are green 2-3 days before the release. Look carefully through logs (check for warnings and notes).
- [ ] Decide what gets merged in before starting release activities.
Release
Prepare the release
- [ ] Create a new release candidate branch
git checkout -b release-candidate-vX.Y.Z
- [ ] Update NEWS.md file: make sure it reflects a holistic summary of what has changed in the package.
- [ ] Remove the additional fields (
Remotes
) from the DESCRIPTION file where applicable. - [ ] Make sure that the minimum dependency versions are updated in the DESCRIPTION file for the package and its reverse dependencies (Optional).
- [ ] Increase versioned dependency on {package name} to >=X.Y.Z (Optional).
- [ ] Commit your changes and create the PR on GitHub (add "[skip vbump]" in the PR title). Add all updates, commit, and push changes:
# Make the necessary modifications to your files # Stage the changes git add <files your modified> # Commit the changes git commit -m "[skip vbump] <Your commit message>" git push origin release-candidate-vX.Y.Z`
Test the release
- [ ] Execute the manual tests on Shiny apps that are deployed on various hosting providers (Posit connect and shinyapps.io) - track the results in GitHub issue (Applicable only for frameworks that use Shiny).
- [ ] Monitor integration tests, if integration fails, create priority issues on the board.
- [ ] Execute UAT tests (Optional).
CRAN submission
- [ ] Tag the update(s) as a release candidate vX.Y.Z-rc
(e.g. v0.5.3-rc1) on the release candidate branch (release-candidate-vX.Y.Z). # Create rc tag for submission for internal validation git tag vX.Y.Z-rc<iteration number> git push origin vX.Y.Z-rc<iteration number>
- [ ] Build the package locally using the command:
R CMD build .
which will generate a .tar.gz file necessary for the CRAN submission. - [ ] Submit the package to https://win-builder.r-project.org/upload.aspx for testing, for more details please see "Building and checking R source packages for Windows": https://win-builder.r-project.org/.
- [ ] Once tested, send the package that was built in the previous steps to CRAN via this form: https://cran.r-project.org/submit.html.
- [ ] Address CRAN feedback, tag the package vX.Y.Z-rc(n+1) and repeat the submission to CRAN whenever necessary.
- [ ] Get the package accepted and published on CRAN.
Tag the release
- [ ] If the additional fields were removed, add them back in a separate PR, and then merge the PR back to main (add "[skip vbump]" in the PR title). If nothing was removed just merge the PR you created in the "Prepare the release" section to 'main'. Note the commit hash of the merged commit. Note: additional commits might be added to the
main
branch by a bot or an automation - we do NOT want to tag this commit.
Make sure of the following before continuing
-
[ ] CI checks are passing in GH before releasing the package.
-
[ ] Shiny apps are deployable and there are no errors/warnings (Applicable only for frameworks that use Shiny).
-
[ ] Create a git tag with the final version set to vX.Y.Z on the main branch. In order to do this:
- Checkout the commit hash.
git checkout <commit hash>
- Tag the hash with the release version (vX.Y.Z).
git tag vX.Y.Z
- Push the tag to make the final release.
git push origin vX.Y.Z
- Checkout the commit hash.
-
[ ] Update downstream package dependencies to (>=X.Y.Z) in {package name}. Note: Once the release tag is created, the package is automatically published to internal repositories.
Post-release
- [ ] Ensure that CRAN checks are passing for the package.
- [ ] Make sure that the package is published to internal repositories.
- [ ] Make sure internal documentation is up to date.
- [ ] Review and update installation instructions for the package wherever needed (Optional).
- [ ] Announce the release on ________.
Decision tree
Click here to see the release decision tree.