axonometric-projection
axonometric-projection copied to clipboard
Configure Renovate
Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.
:vertical_traffic_light: To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.
Detected Package Files
package.json(npm)
Configuration Summary
Based on the default config's presets, Renovate will:
- Start dependency updates only once this onboarding PR is merged
- Separate major versions of dependencies into individual branches/PRs
- Do not separate patch and minor upgrades into separate PRs for the same dependency
- Upgrade to unstable versions only if the existing version is unstable
- Raise PRs immediately (after branch is created)
- If semantic commits detected, use semantic commit type
fixfor dependencies andchorefor all others - Keep existing branches updated even when not scheduled
- Disable automerging feature - wait for humans to merge all PRs
- Ignore
node_modules,bower_components,vendorand various test/tests directories - Autodetect whether to pin dependencies or maintain ranges
- Rate limit PR creation to a maximum of two per hour
- Limit to maximum 20 open PRs at any time
- Group known monorepo packages together
- Use curated list of recommended non-monorepo package groupings
:abcd: Would you like to change the way Renovate is upgrading your dependencies? Simply edit the renovate.json in this branch with your custom config and the list of Pull Requests in the "What to Expect" section below will be updated the next time Renovate runs.
What to Expect
With your current configuration, Renovate will create 10 Pull Requests:
Pin dependencies
- Schedule: ["at any time"]
- Branch name:
renovate/pin-dependencies - Merge into:
master - Pin grunt to
0.4.5 - Pin grunt-contrib-concat to
0.4.0 - Pin grunt-contrib-uglify to
0.5.1 - Pin grunt-contrib-watch to
0.6.1 - Pin load-grunt-tasks to
0.6.0 - Pin time-grunt to
0.3.2
Update dependency grunt-contrib-concat to v0.5.1
- Schedule: ["at any time"]
- Branch name:
renovate/grunt-contrib-concat-0.x - Merge into:
master - Upgrade grunt-contrib-concat to
0.5.1
Update dependency grunt-contrib-uglify to v0.11.1
- Schedule: ["at any time"]
- Branch name:
renovate/grunt-contrib-uglify-0.x - Merge into:
master - Upgrade grunt-contrib-uglify to
0.11.1
Update dependency time-grunt to v0.4.0
- Schedule: ["at any time"]
- Branch name:
renovate/time-grunt-0.x - Merge into:
master - Upgrade time-grunt to
0.4.0
Update dependency grunt to v1
- Schedule: ["at any time"]
- Branch name:
renovate/grunt-1.x - Merge into:
master - Upgrade grunt to
1.2.0
Update dependency grunt-contrib-concat to v1
- Schedule: ["at any time"]
- Branch name:
renovate/grunt-contrib-concat-1.x - Merge into:
master - Upgrade grunt-contrib-concat to
1.0.1
Update dependency grunt-contrib-uglify to v4
- Schedule: ["at any time"]
- Branch name:
renovate/grunt-contrib-uglify-4.x - Merge into:
master - Upgrade grunt-contrib-uglify to
4.0.1
Update dependency grunt-contrib-watch to v1
- Schedule: ["at any time"]
- Branch name:
renovate/grunt-contrib-watch-1.x - Merge into:
master - Upgrade grunt-contrib-watch to
1.1.0
Update dependency load-grunt-tasks to v5
- Schedule: ["at any time"]
- Branch name:
renovate/load-grunt-tasks-5.x - Merge into:
master - Upgrade load-grunt-tasks to
5.1.0
Update dependency time-grunt to v1
- Schedule: ["at any time"]
- Branch name:
renovate/time-grunt-1.x - Merge into:
master - Upgrade time-grunt to
1.4.0
:children_crossing: Branch creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or spam the project. See docs for prhourlylimit for details.
:question: Got questions? Check out Renovate's Docs, particularly the Getting Started section. If you need any further assistance then you can also request help here.
This PR has been generated by WhiteSource Renovate. View repository job log here.