Work Order -> Job Card Time Log Issue

Open sowndharya998 opened this issue 3 years ago • 1 comments

Job Card Against Work Order

  • WorkOrder Has 10 Qty .
  • Bom has 3 Operation and operation batch size 1 and operation time 10min.
  • Submit the work order it create 30 job Card.
  • In Job Card -> Time Log table->Time In mins was calculate for 10qty operation time for single jobcard.
  • Operation Time should calculate 1qty operation time for single jobcard. Screenshot 2021-12-16 at 5 46 28 PM

Screenshot 2021-12-15 at 11 51 08 AM

Information about bug

Screenshot 2021-12-15 at 11 51 58 AM

Version

v13

Module

manufacturing

Version

ERPNext: v13.16.1 (version-13)

Frappe Framework: v13.16.0 (version-13)

Installation method

manual install

Relevant log output / Stack trace / Full Error Message.

No response

Code of Conduct

  • [X] I agree to follow this project's Code of Conduct

sowndharya998 avatar Dec 15 '21 07:12 sowndharya998

Hi @sowndharya998

I tried this in v13/14 and the results are different when I submit the Work Order only 3 Job cards get created as I have 3 Operations in the BOM. Please let me know if I missed something.

  • BOM

    image

  • BOM Operations and Items

    image

  • Work Order Operations

    image

  • Job Card Quantity to Produce

    image

s-aga-r avatar Sep 10 '22 04:09 s-aga-r

@sowndharya998 by default the batch size is 1 and the BOM you have created to manufacture Single Unit of Finished Goods therefore system has set the operation time as 100. This is by design and not an issue.

rohitwaghchaure avatar Nov 28 '22 13:11 rohitwaghchaure