SMM.jl
SMM.jl copied to clipboard
Is there a way to pause and restart?
Hi, thank you for the package. I need to submit the job on the HPC which has a 24 hour maximum time. So, I wonder if I can set a time limit on the optimization and if I can stop and restart the optimization? Thank you.
Yea I think so:
src/exampleSavingLoading.ipynb