php
php copied to clipboard
Tracking: Syncing exercises for #48in24
For #48in24
exercises should be synced a few days before they are featured. Exercism core team polishes these exercises some time in advance (see #48in24
forum threads), but there is no announcement of being ready, yet. So I think, we should not work through this list as fast as possible, only sync them a maximum of 2 weeks ahead of the dates.
Most of these exercises also appear in #628.
To sync an exercise with problem specifications, take these steps:
- [ ] Run
bin/configlet sync -u -e <slug> --yes --docs --filepaths --metadata --tests include
(updates the Markdown files and maybetests.toml
) - [ ] Drop strict types comments from test file and example code (these are useless)
- [ ] Add and sync test meta data to tests (
uuid
/@testdox
in DocBlocks) - [ ] Decide on adding / adjusting / ordering test cases to match current problem specs
Do not redesign the student's interface or add test cases that would invalidate existing community solutions. These are extra tasks, which should be discussed in advance.
Week | Featured at | exercise slug
-
[x] W34 | 2024-09-03 | hamming #790
-
[ ] W35 | 2024-09-10 | rotational-cipher #791
-
[ ] W36 | 2024-09-17 | phone-number #800
-
[ ] W37 | 2024-09-24 | isogram #801
-
[ ] W38 | 2024-10-01 | bob
-
[ ] W39 | 2024-10-08 | two-bucket
-
[ ] W40 | 2024-10-15 | grade-school
-
[ ] W41 | 2024-10-22 | bank-account #720
-
[ ] W42 | 2024-10-29 | food-chain
-
[ ] W43 | 2024-11-05 | eliuds-eggs
-
[ ] W44 | 2024-11-12 | collatz-conjecture
-
[ ] W45 | 2024-11-19 | run-length-encoding
-
[ ] W46 | 2024-11-26 | armstrong-numbers
-
[ ] W47 | 2024-12-03 | diamond
-
[ ] W48 | 2024-12-10 | largest-series-product
Exercises that are synced can be removed from these lists at will.