docs
docs copied to clipboard
OCPP Charger Standard/Advanced Options missleading
[https://docs.evcc.io/docs/devices/chargers#smart-smart-t-acu]
For example here we have minimum 2 Chargepoints built in the station (up to 16).
So connector is not optional.
meterinterval is already set in the template.
Most of the stated metervalues can not be used.