openlane2
openlane2 copied to clipboard
Study correlation between timing values before and after routing
Description
Timing before routing uses estimated parasitics that are correlated but not are ultimately not close enough to the final parasitics.
Proposal
We should tweak the RC values so they can be as close as possible.