Flink Delta Connector end-to-end tests

Open rdziadosz opened this issue 3 years ago • 0 comments

Connector end-to-end tests are developed in order to identify potential bugs automatically at the early development stage.

Implementation plan

In order to make code review easier, the implementation of end-to-end tests should be divided into multiple pull requests. We plan to do it in the following steps (some of them can be done in parallel):

PR-01: Project skeleton.

  • Shows how the project structure looks like.
  • Add sbt modules (tests + fatjar).
  • Add a smoke test (does not schedule any flink job actually).
  • Add terraform skeleton (almost empty).
  • Add run-end-to-end-tests.sh script.

PR-02-A: Terraform.

  • Add terraform creating all necessary infrastructure in AWS.

PR-02-B: Flink REST Client.

  • Java implementation of a client for job scheduling.

PR-03-A: Add bounded reader test scenarios.

  • Add corresponding Flink job.
  • Implement job scenarios. Create multiple pull requests if there are lots of test scenarios.

PR-03-B: Add bounded writer test scenarios.

  • Add corresponding Flink job.
  • Implement job scenarios. Create multiple pull requests if there are lots of test scenarios.

PR-04-A: Add unbounded reader test scenarios.

  • Add corresponding Flink job.
  • Implement job scenarios. Create multiple pull requests if there are lots of test scenarios.

PR-04-B: Add unbounded writer test scenarios.

  • Add corresponding Flink job.
  • Implement job scenarios. Create multiple pull requests if there are lots of test scenarios.

PR-05: Enable to run tests in parallel.