code-gallery
code-gallery copied to clipboard
A collection of codes based on deal.II contributed by deal.II users
As reported on the mailing list (https://groups.google.com/g/dealii/c/kI-Ii8N0kFU). ``` Time step = 206, at t = 2.060000e-01 GMRES_ITR = 8 GMRES_RES = 7.647033e-07 ************************************************************************************************ Time step = 207, at t =...
This modernises the AD data structures used in this code-gallery example.
Implementation of a problem with thermo-electro-mechanical coupling The electro-mechanical and thermal problems are solved in a staggered manner. Two implementations of the electro-mechanical problem are implemented: - the standard two-field...