DAOS-18310 rebuild: refine ds_iv_ns_reint_prep
Cannot do the IV ns cleanup if with in-flight IV operation, wait IV operation's completion in ds_iv_ns_reint_prep before cleanup.
Steps for the author:
- [ ] Commit message follows the guidelines.
- [ ] Appropriate Features or Test-tag pragmas were used.
- [ ] Appropriate Functional Test Stages were run.
- [ ] At least two positive code reviews including at least one code owner from each category referenced in the PR.
- [ ] Testing is complete. If necessary, forced-landing label added and a reason added in a comment.
After all prior steps are complete:
- [ ] Gatekeeper requested (daos-gatekeeper added as a reviewer).
Ticket title is 'Seg fault: 2.8 TB1 - Online harasser mdonssd: (daos_engine) received signal 11 (Segmentation fault)' Status is 'In Progress' Labels: 'md_on_ssd,scrubbed_2.8,soak' https://daosio.atlassian.net/browse/DAOS-18310
Test stage NLT on EL 8.8 completed with status UNSTABLE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net/job/daos-stack/job/daos//view/change-requests/job/PR-17262/9/testReport/
@daos-stack/daos-gatekeeper please consider to land it, there is only one unrelated known issue of NLT failure.