daos
daos copied to clipboard
DAOS-14679 pool: Report on stopping sp_stopping (#14374)
When destroying a pool on an engine (as part of a pool destroy command), we may block in
ds_pool_stop
pool_put_sync // putting the last reference
pool_free_ref // called after the hash rec deletion
pool_child_delete_one
pool_child_stop
waiting for some ds_pool_child references. If the user retries the pool destroy command, the new ds_pool_stop call on this engine can't find the ds_pool object that is in the sp_stopping state, and the new pool destroy command usually succeeds, even though the storage capacity allocated to the pool hasn't been released yet.
This patch makes the following changes:
-
Move the pool_child_delete_one collective call from pool_free_ref to before the ds_pool_put call in ds_pool_stop. This makes sure that the ds_pool object remains in the LRU cache in the sp_stopping state while we wait for ds_pool_child references (or some other upper layer resource).
-
Remove the pool_put_sync trick, which was introduced because of the pool_child_delete_one collective call in pool_free_ref.
-
Return an error from ds_pool_stop when the ds_pool object is in the sp_stopping state, so that the new pool destroy command in the aforementioned scenario will return an explicit error.
-
Register a reply aggregation callback for MGMT_TGT_DESTROY so that an error can reach the control plane.
Required-githooks: true
Before requesting gatekeeper:
- [ ] Two review approvals and any prior change requests have been resolved.
- [ ] Testing is complete and all tests passed or there is a reason documented in the PR why it should be force landed and forced-landing tag is set.
- [ ]
Features:(orTest-tag*) commit pragma was used or there is a reason documented that there are no appropriate tags for this PR. - [ ] Commit messages follows the guidelines outlined here.
- [ ] Any tests skipped by the ticket being addressed have been run and passed in the PR.
Gatekeeper:
- [ ] You are the appropriate gatekeeper to be landing the patch.
- [ ] The PR has 2 reviews by people familiar with the code, including appropriate owners.
- [ ] Githooks were used. If not, request that user install them and check copyright dates.
- [ ] Checkpatch issues are resolved. Pay particular attention to ones that will show up on future PRs.
- [ ] All builds have passed. Check non-required builds for any new compiler warnings.
- [ ] Sufficient testing is done. Check feature pragmas and test tags and that tests skipped for the ticket are run and now pass with the changes.
- [ ] If applicable, the PR has addressed any potential version compatibility issues.
- [ ] Check the target branch. If it is master branch, should the PR go to a feature branch? If it is a release branch, does it have merge approval in the JIRA ticket.
- [ ] Extra checks if forced landing is requested
- [ ] Review comments are sufficiently resolved, particularly by prior reviewers that requested changes.
- [ ] No new NLT or valgrind warnings. Check the classic view.
- [ ] Quick-build or Quick-functional is not used.
- [ ] Fix the commit message upon landing. Check the standard here. Edit it to create a single commit. If necessary, ask submitter for a new summary.