Release 7.1.2 - May 2024
Status of Bazel 7.1.2
- Expected first release candidate date: 2024-05-06
- Expected release date: 2024-05-08
- List of release blockers
To report a release-blocking bug, please add a comment with the text @bazel-io flag
to the issue. A release manager will triage it and add it to the milestone.
To cherry-pick a mainline commit into 7.1.2, simply send a PR against the release-7.1.2
branch.
Task list:
- [x] Create release candidate
- [ ] Check downstream projects
- [ ] Create draft release announcement
- [ ] Push the release and notify package maintainers: See comment
- [ ] Update the release page
Hey @ahumesky is there a particular change you'd like to include in these releases?
Sorry, I thought I was in a different tab, this made no sense :)
We are no longer planning for 7.1.2 release. Closing.
Bringing this back to address some high-priority issues before 7.2. Release dates updated in the comment above.
Bazel 7.1.2rc1 is now available for those that want to try it out.
You can download it from here: https://github.com/bazelbuild/bazel/releases/tag/7.1.2rc1 If you're using Bazelisk, you can point to this RC by setting USE_BAZEL_VERSION=7.1.2rc1.
Please test it out and report any issues here as soon as possible - the final release is scheduled for Wednesday, 5/8. A draft of the release notes can be found here.
Thanks!
Bazel 7.1.2 is now available: https://github.com/bazelbuild/bazel/releases/tag/7.1.2
cc: @excitoon, @vbatts for updating Scoop and Fedora packages. Thanks.