missing classes for the tasks module
Description of the issue
The tasks module was added due to #1891 with definitions provided by the domain expert. Some of the concepts in these definitions are absent in the OEO. I made a list of every concept I found more or less worth adding and propose a definition - though some of those definitions definitely could be improved. Some of the concepts may not be relevant enough to add, I put these in the bottom.
Ideas of solution
I would find most important to add:
-
wind characteristicsis already a separate issue (#1965) -
levelized cost of energyas an alternative label forlevelized cost of electricity(which is already in the oeo) since both are well used. -
Capital expenditures(CAPEX) are costs for physical assets (eg. and, equipment) including things like acquisition and maintenance. The asset has to have a useful life of more than on year. It is calculated as (prior period Property, Plant and Equipment) - (current period Property, Plant and Equipment) + (current Depreciation). #1971 -
Ongoing operational expenditures(OPEX) are costs for day-to-day operations (e.g. rent, wages) of a company not including whatever value is actually produced by said company. #1972 -
capacity factorandCFas alternative labels fornet capacity factor.To me these seem to be the same concept at least. -
wind power density(WPD) is a quantity vale of the power wind has in a specific area. It is calculated as 0.5 * air density * (wind speed to the power of 3) #1997 -
multi-criteria decision analysis(MCDA) is a methodology to help with decision making by defining goals, priorities and weights. #1998
I would find these less important but maybe still useful:
-
economic potentialis the potential for economic development. (we already haveeconomic stock potentialandeconomic flow potentialin the oeo) -
geographical potentialis the potential given by the physical location. -
wake lossis a loss in power output of turbines that occur due to speed reduction of wind that already passed another turbine. (Currently we don't have losses in the oeo but is has been discussed in #1823. Maybe that could be revived) -
exclusion zoneis a two-dimensional spatial region in which specific activities are forbidden. -
buffer zoneis a two-dimensional spatial region meant to keep opposing parties spatially apart. -
interest rateis an economic value that shows how much interest is added to a value per time period. -
operating costis a cost that is given due to operating a thing day-to-day. -
maintenance costis a cost given by maintaining a thing so it stays operational.
Workflow checklist
- [ ] I discussed the issue with someone else than me before working on a solution
- [ x] I already read the latest version of the workflow for this repository
- [x ] The goal of this ontology is clear to me
I am aware that
- [ x] every entry in the ontology should have a definition
- [ x] classes should arise from concepts rather than from words
I think this is kind of a meta issue. Especially more complex topics deserve a separat issue.
Capital expenditures(CAPEX) are costs for physical assets (eg. and, equipment) including things like acquisition and maintenance. The asset has to have a useful life of more than on year. It is calculated as (prior period Property, Plant and Equipment) - (current period Property, Plant and Equipment) + (current Depreciation).Ongoing operational expenditures(OPEX) are costs for day-to-day operations (e.g. rent, wages) of a company not including whatever value is actually produced by said company.
I think, these are worth a separat issue together.
economic potentialis the potential for economic development. (we already haveeconomic stock potentialandeconomic flow potentialin the oeo)geographical potentialis the potential given by the physical location.
Separat issue:
economic potential would be a "parent" concept for economic stock and flow potential. We could think about either making "economic potential" alternative label to both concepts, or introduce it as equivalent parent class that has both subtypes as children.
geographical potential is probably a special type of theoretical (stock or flow) potential.
I fear, we'll have to find sensible ways to define smart parallel hierarchies, if we want to introduce these classes.
exclusion zoneis a two-dimensional spatial region in which specific activities are forbidden.buffer zoneis a two-dimensional spatial region meant to keep opposing parties spatially apart.
This fits well the discussion in #1962
interest rateis an economic value that shows how much interest is added to a value per time period.operating costis a cost that is given due to operating a thing day-to-day.maintenance costis a cost given by maintaining a thing so it stays operational.
We have already some concepts that at least partially depict operating and maintenance cost, e.g. fixed cost. Could you please review the cost classes respectively and open a seperate issue @madbkr
EDIT: we could consider these concepts in #1914
Some of these might be fixed easily in an oeo-dev meeting (or at least worth a discussion there first):
wind characteristicsis already a separate issue (Addition for or of wind characteristics #1965)levelized cost of energyas an alternative label forlevelized cost of electricity(which is already in the oeo) since both are well used.capacity factorandCFas alternative labels fornet capacity factor.To me these seem to be the same concept at least.wind power density(WPD) is a quantity vale of the power wind has in a specific area. It is calculated as 0.5 * air density * (wind speed to the power of 3)multi-criteria decision analysis(MCDA) is a methodology to help with decision making by defining goals, priorities and weights.wake lossis a loss in power output of turbines that occur due to speed reduction of wind that already passed another turbine. (Currently we don't have losses in the oeo but is has been discussed in Losses of Energy Transfer #1823. Maybe that could be revived)