[Suggestion] Maintain the total amount required in Todo List
This is something that really bugs me off while using this already great tool. For example, I have a total of 7 todo list which requires 7M of Mora, and currently I have 2.5M. So, I've clicked the "-50000" button until the amount reduced to 4.5M. After a while, my Mora is now 3M but I forgot that I've earned 500k since the last update. I've opened todo list but it's not helping since the amount shown is, well, 4.5M; so I don't know how much do I need to reduce.
It would be great if both "amount needed" AND "total amount" are displayed in todo list (i.e. "4.5M Mora needed of 7M"), so that since I currently have 3M, I can easily figure out that I need to reduce the amount needed from 4.5M to 4M (by substracting the total of 7M with my current 3M of Mora).
Yep, this is already planned :)