Matija Pavičević
Matija Pavičević
Potential hydro scheduling improvements: - [x] #98 - [x] #99 - [ ] #100 - [ ] #101 - [ ] #102
When flood control energy storage is reached, the set of reservoirs associated with this constraint has to spill to keep the stored energy below the user-defined target.
New parameters: - [ ] costs for breaching alert levels and security energy levels (up and down) - [ ] alert level time series for each unit (is automatic calculation...
- [ ] or by limiting the maximum reservoir storage that avoids downstream flooding. The model will use the minimum value between the value provided in the inputs and maximum...
- [ ] Downstream flood regulation can be achieved either by limiting the downstream flow. This allows the definition of chronological maximum outflow limits (sum of turbined and spilled flows)...
Some large hydro reservoirs do not have spillways. There should be a flag for each unit enabling or disabling spillage.
It might be a good idea to provide some documentation on readthedocs.io because its free for OS projects like this one and the web page would look similar to Dispa-SET...