Once all has been collected I will arrange WEEE recycling for the machines.
 Disks going for disposal. All wiped.
The switch rack mounts are at the front of the rack @ AMS. The switches are in the rack, but not yet mounted. We are still awaiting delivery of the...
2x ex-um-4x4sfp were delivered yesterday. On rack shelf.
We should do it. Else we risk blowing trip switch on our rack.
Done. thorn-01 (lockheed), thorn-02, thorn-02, dulcy and faffy power on delayed. Delay between 90 seconds and 180 seconds. Rest power on immediately on power return. See private repo https://github.com/openstreetmap/oxidized-configs for...
Storage requirement is around 12TB
Initial one-off backup has started.
Initial one-off backup finished awhile back.
I did eventually find a KVM crash trolley, but is required a C14 to UK power plug which I wasn't able to find.