robo-paracept icon indicating copy to clipboard operation
robo-paracept copied to clipboard

Setting maximum number of threads for taskParallelExec

Open AdamOakman opened this issue 3 years ago • 0 comments

Let's assume I want to run 20 tests in total but only 10 at the same time to avoid putting a big load on the application under test.

I would like to configure robo-paracept to run maximum 10 threads (once one thread finishes another from the queue is grabbed and launched) - is it possible?

AdamOakman avatar Jul 26 '21 09:07 AdamOakman