prime-reportstream icon indicating copy to clipboard operation
prime-reportstream copied to clipboard

Message Testing Automation next steps and rough requirements

Open chris-kuryak opened this issue 1 year ago • 0 comments

Problem statement

Now that we have received feedback/ideas from engineering, we want to begin formulating a plan for our message testing improvements.

What you need to know

  • MVP Scope so far:
    • Two features:
      • Message testing bank to choose from
      • Interface for engineers to test messages with settings in staging
    • Focus on being functional for onboarding engineers, not support team or external users
  • UI Enhancement Mural

Acceptance criteria

  • [ ] Document a flow that meets (and shows) the needs from existing convos with engineers
  • [ ] Document rough idea for what it will look like, very roughly
  • [ ] Identify what pieces/features need to be built
  • [ ] Align with onboarding engineers and get feedback
  • [ ] (If time permits) Document Suggestions for MVP requirements on each new feature (Message Creation/Selection and Message Testing)
  • [ ] Review with Product

chris-kuryak avatar May 22 '24 02:05 chris-kuryak