shiny.semantic
shiny.semantic copied to clipboard
Calendar range support
Fixes #363
This PR improves #366, solves the maximum date problem, and resolves comments that are left for this one.
DoD
-
[x] Major project work has a corresponding task. If there’s no task for what you are doing, create it. Each task needs to be well defined and described.
-
[x] Change has been tested (manually or with automated tests), everything runs correctly and works as expected. No existing functionality is broken.
-
[x] No new error or warning messages are introduced.
-
[x] All interaction with a semantic functions, examples and docs are written from the perspective of the person using or receiving it. They are understandable and helpful to this person.
-
[x] If the change affects code or repo sctructure, README, documentation and code comments should be updated.
-
[ ] All code has been peer-reviewed before merging into any main branch.
-
[ ] All changes have been merged into the main branch we use for development (develop).
-
[ ] Continuous integration checks (linter, unit tests) are configured and passed.
-
[x] Unit tests added for all new or changed logic.
-
[ ] All task requirements satisfied. The reviewer is responsible to verify each aspect of the task.
-
[ ] Any added or touched code follows our style-guide.