apollo
apollo copied to clipboard
[planning] calculation of cost in gridded_path_time_graph.cc
when calculating the cost in CalculateCostAt(), why the acc is calculated as 2 * (cost_cr.point().s() / unit_t_ - init_point_.v()) / unit_t_, while in calculating the cost of edge the acceleration is calculated without 2 * ?