Chhogori-K2 icon indicating copy to clipboard operation
Chhogori-K2 copied to clipboard

Assembly issues: Backpack

Open ameyp opened this issue 2 years ago • 0 comments

List of issues I encountered during assembly

  • The backpack extrusions should be mounted using M5x8 BHCS, the eDrawing says M5x10 BHCS. The latter are too long and bottom out with a 1mm gap left between the bolt head and the back panel
  • The BOM needs a lot more M5x8 BHCS. Right now it says 2, but everything in the backpack uses them

ameyp avatar Mar 28 '22 18:03 ameyp