backwpup
backwpup copied to clipboard
When deactivating a job, the other job's schedule might be reset
Context
On v5.0.2
https://github.com/user-attachments/assets/fb7f78f0-55e0-4038-9fd7-e233083ae672
Reproducible on mathieulamiot.com (I can provide access if needed, or info on the DB).
It seems to happen when both jobs are on the same schedule, and I stop one of them.
Expected behavior When I deactivate a job, the configuration of the other one must not be altered.
Acceptance Criteria
See video
- Activate both jobs and make them on the same schedule.
- Refresh the page. The scheduled page must be the same.
- Delete the File job.
- Refresh. The DB job schedule must not have changed.