backwpup icon indicating copy to clipboard operation
backwpup copied to clipboard

When deactivating a job, the other job's schedule might be reset

Open MathieuLamiot opened this issue 10 months ago • 0 comments

Context

On v5.0.2

https://github.com/user-attachments/assets/fb7f78f0-55e0-4038-9fd7-e233083ae672

Reproducible on mathieulamiot.com (I can provide access if needed, or info on the DB).

It seems to happen when both jobs are on the same schedule, and I stop one of them.

Expected behavior When I deactivate a job, the configuration of the other one must not be altered.

Acceptance Criteria

See video

  • Activate both jobs and make them on the same schedule.
  • Refresh the page. The scheduled page must be the same.
  • Delete the File job.
  • Refresh. The DB job schedule must not have changed.

MathieuLamiot avatar Feb 04 '25 18:02 MathieuLamiot