airbyte
airbyte copied to clipboard
π source-copper: run up-to-date pipeline [2025-05-31]
Update source-copper
This PR was autogenerated by running airbyte-ci connectors --name=source-copper up_to_date --pull
We've set the auto-merge label on it, so it will be automatically merged if the CI pipelines pass.
If you don't want to merge it automatically, please remove the auto-merge label.
Please reach out to the Airbyte Connector Tooling team if you have any questions or concerns.
Operations
-
Upgrade the base image to the latest version in metadata.yaml: Successful
-
PATCH bump source-copper version to 0.4.15: Successful
-
Build source-copper docker image for platform(s) linux/amd64, linux/arm64: Successful
-
Get dependency updates: Successful
-
Create or update pull request on Airbyte repository: Successful
-
Add changelog entry: Successful
Dependency updates
We use syft to generate a SBOM for the latest connector version and the one from the PR.
It allows us to spot the dependencies that have been updated at all levels and for all types of dependencies (system, python, java etc.).
Here are the dependencies that have been updated compared to airbyte/source-copper:latest.
Keep in mind that :latest does not always match the connector code on the main branch.
It is the latest released connector image when the head commit of this branch was created.
| Type | Name | State | Previous Version | New Version |
|---|---|---|---|---|
| python | airbyte-cdk | updated | 6.51.0 | 6.53.0 |
| python | joblib | updated | 1.5.0 | 1.5.1 |
The latest updates on your projects. Learn more about Vercel for Git βοΈ
1 Skipped Deployment
| Name | Status | Preview | Comments | Updated (UTC) |
|---|---|---|---|---|
| airbyte-docs | β¬οΈ Ignored (Inspect) | Visit Preview | Aug 2, 2025 5:29pm |
π Greetings, Contributor!
Here are some helpful tips and reminders for your convenience.
Helpful Resources
- Developing Connectors Locally
- Managing Connector Secrets
- On-Demand Live Tests
- On-Demand Regression Tests
#connector-ci-issues#connector-publish-updates#connector-build-statuses
PR Slash Commands
Airbyte Maintainers (that's you!) can execute the following slash commands on your PR:
/format-fix- Fixes most formatting issues./bump-version- Bumps connector versions./run-cat-tests- Runs legacy CAT tests (Connector Acceptance Tests)
source-copper Connector Test Results
14 testsβββ9 β ββ37s β±οΈ β1 suitesββ4 π€ β1 filesββββ1 β
For more details on these failures, see this check.
Results for commit 1ffef9bd.
:recycle: This comment has been updated with latest results.
Deploy preview for airbyte-docs ready!
β Preview https://airbyte-docs-gubnjc6g7-airbyte-growth.vercel.app
Built with commit 1ffef9bd9e6a6a883730cfc42e8e8812b810546d. This pull request is being automatically deployed with vercel-action
Thank you for your submission! We really appreciate it. Like many open source projects, we ask that you sign our Contributor License Agreement before we can accept your contribution.
You have signed the CLA already but the status is still pending? Let us recheck it.