Validation of the Power System Model for 2019
Strongly related to changes in #353
Note: We should disable the simplify wildcard in order to keep most of the generators separately and therefore their costs and efficiencies.
Validation methods
We separate the validation into two steps:
Validation of the Network pre-optimization
Powerplants
- [x] Capacity totals per country and carrier for conventionals - remove remaining duplicates (@FabianHofmann )
- [x] Renewable capacities from OPSD dataset - per country or all of Europe? (@chrstphtrs, @martacki)
- [x] scaling of existing capacities (exogeneously)
- [ ] Revise efficiencies of single plants (heuristics based on commissioning year/country?) (@lisazeyen)
- [ ] Must-run conditions for CHPs still need to be quantified ( @chrstphtrs , @FabianHofmann, @Irieo )
Cross-border Capacities
- [x] Double-check cross-border transmission capacities ( @Irieo, @martacki )
- [ ] How does the spatial resolution affect the simulation?
Costs
- [ ] Add 2020 costs
Validation of the Network post-optimization
- [ ] Energy mix per country
- [ ] Import/Export balances
- [ ] OCGT dispatch