dd-sdk-ios
dd-sdk-ios copied to clipboard
Update bundle
What and why?
Running command:
bundle update
Review checklist
- [ ] Feature or bugfix MUST have appropriate tests (unit, integration)
- [ ] Make sure each commit and the PR mention the Issue number or JIRA reference
- [ ] Add CHANGELOG entry for user facing changes
Datadog Report
Branch report: maciey/bundler-update
Commit report: 08fd903
Test service: dd-sdk-ios
:white_check_mark: 0 Failed, 3491 Passed, 0 Skipped, 2m 22.98s Total Time :small_red_triangle_down: Test Sessions change in coverage: 3 decreased, 4 increased, 7 no change
:small_red_triangle_down: Code Coverage Decreases vs Default Branch (3)
/merge
:steam_locomotive: MergeQueue: waiting for PR to be ready
This merge request is not mergeable yet, because of pending checks/missing approvals. It will be added to the queue as soon as checks pass and/or get approvals.
Note: if you pushed new commits since the last approval, you may need additional approval.
You can remove it from the waiting list with /remove command.
Use /merge -c to cancel this operation!
:steam_locomotive: MergeQueue: pull request added to the queue
The median merge time in develop is 0s.
Use /merge -c to cancel this operation!
:x: MergeQueue: This merge request was updated
This PR is rejected because it was updated
If you need support, contact us on Slack #devflow with those details!
/merge
:steam_locomotive: MergeQueue: waiting for PR to be ready
This merge request is not mergeable yet, because of pending checks/missing approvals. It will be added to the queue as soon as checks pass and/or get approvals.
Note: if you pushed new commits since the last approval, you may need additional approval.
You can remove it from the waiting list with /remove command.
Use /merge -c to cancel this operation!
:steam_locomotive: MergeQueue: pull request added to the queue
The median merge time in develop is 0s.
Use /merge -c to cancel this operation!
:x: MergeQueue: The build pipeline contains failing jobs for this merge request
Build pipeline has failing jobs for 761cfa5:
⚠️ Do NOT retry failed jobs directly (why?).
What to do next?
- Investigate the failures and when ready, re-add your pull request to the queue!
- Any question, go check the FAQ.
Details
Since those jobs are not marked as being allowed to fail, the pipeline will most likely fail. Therefore, and to allow other builds to be processed, this merge request has been rejected and the pipeline got canceled.
If you need support, contact us on Slack #devflow with those details!
/merge
:steam_locomotive: MergeQueue: waiting for PR to be ready
This merge request is not mergeable yet, because of pending checks/missing approvals. It will be added to the queue as soon as checks pass and/or get approvals.
Note: if you pushed new commits since the last approval, you may need additional approval.
You can remove it from the waiting list with /remove command.
Use /merge -c to cancel this operation!
:steam_locomotive: MergeQueue: pull request added to the queue
The median merge time in develop is 46m.
Use /merge -c to cancel this operation!