LibreSolarBox
LibreSolarBox copied to clipboard
Testing - Libre Solar Box
Brainstorming
-
place to put solarpanel depending on irriadtation (-> pyranometer)
-
installation of solarpanels, mountin & wiring (-> how much wire we need?)
-
connecting to box
-
[ ] wires, mounting hardware
-
[ ] testing devices -> pyranometer, multimeter
-
calculation efficiency of whole system (solarpanels, MPPT, BMS, battery)
-
maximum output, behaviour (temperature, efficiency level, nominal point)
-
traces for validation (system parameter)
-
choosing differents loads
-
standards for decentral energy systems? VDMA, VDE?
-
[ ] sheet with testing procedures
-
[ ] preparing folder in github
@Tatytorres specification of used solar panels at the fablab. see: https://www.jws-store.de/solarenergie/solarpanels-mono-12volt/55watt-solarpanel-12-volt-monokristallin/a-194/
Technische Daten:
Nennleistung Pmax 140 Watt Spannung bei Nennleistung Vpmax 22 Volt Leerlauf Spannung Voc 26 Volt Kurzschluss Strom Isc 6,87 Ampere Strom bei Nennleistung Ipmax 6,36 Ampere Temperaturbereich -40°C / + 85°C Toleranz +/-3 % Flexible monokristalline hochleistungs Solarzellen von SUNPOWER, Wirkungsgrad über 21% Abmessungen: 1490 x 560 x 3mm Gewicht 2 kg
Meeting 05.04
3 main parts for doing. goal finishing end of summer (30.09).
1. Testing of components (MPPT, BMS)
- what to test, how to test, when to test
2. Installation of Energy System in Fablab St.Pauli
- which loads, how much solar power, how much capacity -> design and layout till 06.18
3. Monitoring
- energy data monitoring and analysis till 09.18
next steps:
- talk to mr. kampschulte
- access to laboratory, possibilties for praxis work, ...
- set up a concept plan
- set up a timeplan
Meeting 12.04
basic concept

concept for discussion @CollectiveOpenSourceHardware/00_reproduction_prototyping

Testing the BMS:
- find out the BMS requirements / What does the BMS needs to do: • Voltage balancing • Temperature checking • etc
- Testing if the BMS fulfils each requirement: • Measure the voltage at each cell etc
Messplan:
MPPT
- min/max Strom: 0..20A
- min/max Spannung: 16V..55V
- Effizienzpunkte (eta(P))
- Spannungsqualität am Ausgang (Regelverhalten bei Sprung am Eingang)
- MPPT Qualität (Abweichung, Zeit)
BMS
- min/max Strom: 0..30A
- (Schutzmechanismen - Ladeschlussspannung, Tiefentladeschutz)
- Effizienzpunkte (eta(P))
@Tatytorres @SchneiderAn - Hey guys, whats the status with testing the components?